Solar installation covers every stage from the initial site visit to flipping the switch on live energy generation. The process includes site assessment, system design, permitting, panel mounting, electrical wiring, inverter installation, and a final safety inspection.
Good to know: The entire journey typically takes 6–12 weeks from first contact to activation. Installation day itself is usually 1–3 days depending on system size.
Installation Types
Most common
Rooftop Solar
Maximises existing space, ideal for most Scottish homes. Requires a structural roof assessment before installation.
Best performance
Ground Mounted
Better ventilation, easier maintenance access. Needs available yard space and ground surveys.
Flexible
Portable Systems
Lower upfront cost, no structural work required. Less efficient and lower output than fixed systems.
Installation Process — Step by Step
Consultation & Assessment
Free site evaluation. We assess your roof, energy usage, and confirm solar suitability.
System Design
Our engineers create a custom layout optimised for your roof orientation and household demand.
Permits & Approvals
We handle all government and utility paperwork, including grid connection applications.
Equipment Procurement
Panels, inverter, mounting hardware, and monitoring equipment ordered to spec.
Installation Day
Panels mounted and wired by our MCS-certified team. Typically 1–3 days on site.
Final Inspection
Full safety checks, system testing, and sign-off by a qualified electrician.
Activation
Your system goes live. We walk you through the monitoring app so you can track every unit generated.
Maintenance After Installation
Solar panels are low maintenance by design. Rain naturally cleans the glass surface, and modern systems self-monitor for faults.
Monthly
Visual check & clear any debris from panels
Annual
Professional clean & system test recommended
£100–300
Typical annual maintenance cost